Short Lead Time for Galvanized Suspended Platform - H Frame Scaffolding – HBMEC
Short Lead Time for Galvanized Suspended Platform - H Frame Scaffolding – HBMEC Detail:
Ring lock Scaffold
Scaffolding climbing frame
Product Parameters
| Product Name | china manufacturer time saving construction scaffolding |
| Climbing Scaffolding Unit Height | 12.6-14.4m |
| Climbing Scaffolding Unit Width | 0.9m |
| one Deck Height | 1.8m |
| Horizontal span | <7.5 |
| Distance from wall | 0.2-0.8 |
| Allowable deviation | ±15mm |
| Dead Load | <4T |
| Allowable Loading Capacity | <3x2KN/m |
| Lifting speed | 3m/h |
| Surface Treatment | Painted |
Adjustable Pipes Support
Construction Cases
Packing
Product detail pictures:
Related Product Guide:
Our primary goal is to offer our clients a serious and responsible business relationship, providing personalized attention to all of them for Short Lead Time for Galvanized Suspended Platform - H Frame Scaffolding – HBMEC , The product will supply to all over the world, such as: Boston, Bulgaria, Turkmenistan, We also provide OEM service that caters to your specific needs and requirements. With a strong team of experienced engineers in hose design and development, we value every opportunity to provide products and solutions for our customers.
The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
Write your message here and send it to us






